| Customization: | Available |
|---|---|
| Gender: | Kids |
| Display Methods: | Digital |
| Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
|---|
| Payment Methods: |
|
|---|---|
| Support payments in USD |
| Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
|---|
| Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
|---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
| Product Name | OEM custom injection mould for plastic part |
| Mold Base: | LKM,HASCO,DME,etc... |
| Product Name: | UL Approved mold maker plastic injection molding Mould overmoulding |
| Mold Cavity: | Single, Mult, Family... |
| Molding Material: | ABS, PA6, PA12,PA66, PBT, PC,PC/ABS,PC/PBT,PE-HD,PE-LD,PEI,PET,PETG,PMMA,POM,PP,PPE,PS,PVC,SA... |
| Color: | transparent, solid color according to your requests |
| Surface: | textured,glossy or mirror polished,printing,plantingect. |
| Design software: | PRO/E.Solidwork,UG.Moldflow.Autocad,etc |
| Mold Material: | S45C, P20, 718, 718H, 2738, 738H, NAK80, SKD61, E420, etc. (for reference only),Autodesk Inventor, SolidWorks, CATIA V5, Solid Edge, UGS NX, Pro/ENGINEER |
| File Formats | STEP, IGES, SAT, DWG, DXF, VDA. |
| Mold Life: | 300,000~1,000,000cyces according to your requests |
| Runner: | Cold, hot runner such as YUDO.MASTER.SYNVENTIVE.etc. |
| Lead time to T1 sample: | 3~5 weeks |
| lead-time for production: | 1~2 weeks |
| Quality: | ISO 9001:2015 |
| Precision: | 0.005mm |
| Service: | OEM &ODM service. and mold for exports as well. |




Q1. How about your quality?
♦Best QA & QC system can guarantee the die casting mould quality.
♦We will make the operation instruction once the sample is approved.
♦We inspect almost every mass production step from raw material arrival inspection, die casting parts production process control, to moulds already assembled checking and testing, final production package inspection, etc.
♦Our salesman will also spot check these steps to ensure mass production quality.
Q2. How long should we take for a quotation?
After receiving detailed information(your 2D/3D drawings or samples), we will quote you within 2 days.
Q3. What is your quotation element?
Drawings or Sample, Material, Finish, and Quantity.
Q4. What is your payment term?
Mold: T/T, 40% deposit to place an order, 30% payment on first samples, 30% payment on sample approval or before shipment.
Goods: 50% prepaid, balance T/T before shipment.