| Customization: | Available |
|---|---|
| Shaping Mode: | Injection Mould |
| Surface Finish Process: | Polishing |
| Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
|---|
| Payment Methods: |
|
|---|---|
| Support payments in USD |
| Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
|---|
| Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
|---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
| PLASTIC INJECTION PART BASIC INFORMATION | |
| Product Name | High Precision Mould |
| Product Material | ABS, PA, PA66+30GF, PBT, PC, POM, PP, PE, MA,PVC,TPE,TPU etc |
| Surface Requirement | Smooth, Polishing, Painting, SandBlasting, Electroplate, Silk-screen, Laser Etching, Anodizing,Brushing |
| Plastic Part Resin | thermoplastic/Thermosetting |
| Tolerance Request | UP to (±0.005mm) |
| Lifetime | >300 Thousand Times |
| Part Size Range | 5-1000mm,or customized |
| Multi Injection | Single/Double/multi color |
| Design Software | Pro/E,UG,Catia,Woodwork,Moldflow,AutoCad |
| Quality Assurance | Design Control, Steel Hardness Inspection Report, Steel Dimension Control Report, Mold Core and Cavity Dimension Inspection Report |
| PLASTIC INJECTION MOULD BASIC DESCRIPTION | |
| Injection System | Hot /Cold Runner |
| Inserts(cavity and core) | H13, 1.2344, 1.2738, 1.2083, 1.2311, NAK80 or as your request |
| Mold Cavity | 1*1,1+1,1*2,1+1+1,etc |
| Gate type | Side gate,Sub gate,Pin point gate,Edge gate etc |
| Ejector System | Stripper plate,Lifter,Push bar,Ejection pin etc |
| Steel for Mould | P20, 718, 8407, NAK80, H13, S136, DIN 1.2738, DIN 1.2344, etc. |
| Steel Standard | FINKL,Assab,DAIDO,LKM,Buderus |
| Cooling | Baffles/Sprin Piple/3D printing water line |
| Lead time of first samples | Around 4~7weeks |
| Standard Parts/Cylinders | DME/HASCO/PROGRESSIVE/MISUMI/Parker/HP/Merkle |
| Design Capability | DFM,Mould flow analysis,Product optimization, Full 2D & 3D mould design,Reverse engineering,Collaborative design with customer's idea |
| Documents / Reports Provided | Fully drawing,Weekly Processing Report, Steel Dimension report, Processing Report,Sample Dimension Report. |

1. Manufacturing and exporting experience for nearly 10 years. ISO 9001 approved
2. Products are supplied to over 20 countries.
3. One-stop service for aluminum profiles, plastic parts, rubber parts, and moulds. Save time and save money for you.
4. In-house mold design and building capabilities.
5. No reclaimed material used to ensure high quality.
6. Keep secret to your idea and your design.
7. 24 hours (two shifts) / 6 days for production.
8. Professional design team, mold maker engineer. OEM/ODM service.
9. Professional QC and R&D teams to assure high quality.
10. Professional sales team. Good English capabilities and communication skills.
11. No MOQ.
12. Prompt delivery. For prototype: 3-7 days. Production orders can be arranged specially to meet customer's urgent demands.
13. Geographical advantages: within 30 minutes to airport or sea port, near to Hongkong.
You can know more about us from howemold.en.made-in-china.com, Looking forward to having a good start for our reliable cooperation!

* Are you factory or trading company?
HOWE is a plastic mold factory in Dongguan, China, welcome to visit us.
* Is HOWE an ISO registered company?
Yes, GBM is an ISO 9001:2015 certified mold manufacturer, we take pride in our constantly improving process and always try to add
value for customers with the best efforts.
* What type of tooling services do you offer?
HOWE can help you manufacture, assemble and printing for your plastic parts. Besides normal molding process, HOWE has deep expertise of 2-shots molding, over-moulding and vertical insert molding.
* Do you have in-house mold design?
Yes, we have our own design team, our engineering manager has over 10 years' experience.
* How long it takes to design my mold?
The mold design timeline is dependent upon the complexity of the project. A simple construction mold can be designed in 1 or 2 days, while a complex mold can take several weeks. HOWE designers and project manager will work closely with you to design your mold in prefessional and efficient manner.